We poured over 300 plus yards of concrete
at the Goodyear Lake dam generating station. Ramps were built to
create an even flow of water into the generating turbines.
Approximately 325 yards of Zebra mussels were removed from the canal
prior to work starting. Here are some shots of the work.
Click on the photo for a closer look.
Lakeside Home
On this project there was
the rebuilding and the placing of supports under a lakeside home to
create a strong floor. During this phase of the project the
basement was dug out to facilitate the placement of a new support
system. The building was brought back to level at this time.
While this project was being done, we replaced an old retaining wall,
that was falling into the lake with a new 6X6 pressure treated retaining
wall.
For a closer look, click on the photo.